Good design must not be only safe but must aim to save construction costs, time and materials. The following procedures should help to achieves this and an ‘educated’ client will recognize the importance of funding this work with a realistic fee.
1. DECIDE THE LOCATION OF COLUMNS & FOUNDATION AND TYPE OF LOADS ACTING ON THEM.(E.X. DEAD LOAD, LIVE LOAD OR WIND LOAD)
No comments:
Post a Comment